Many homebuilders have a good reputation for delivering a quality product because they work very hard at fixing construction punch list items. The problem is — the number of punch items to fix never gets smaller. The best quality project management process focuses on reducing the number of punch items being found. If you eliminate your top 10 problems that produce punch items, the number of punch items and deficiencies that come up will be reduced dramatically.
This will result in a huge payback for both your business and the subcontractor. Here's how to start a home builder quality management process that focuses on improving quality on construction project by preventing problems:
You'll need to start collecting data on what and how many issues are getting through your current process. The first step is to create a comprehensive final inspection, or a pre-closing checklist, and either enter the inspection information into a spreadsheet or use construction QA/QC software to collect the information.
If you don't already use checklists, you can start by creating a checklist that includes similar checks to what your most experienced inspector(s) currently visually inspect.
Include a heading and checkpoints for each main area being inspected. Put these in the order your inspectors typically work. For example, you can organize your checklist first by exterior and interior areas and then add rooms and areas within those broader categories.
Include instructions for taking pictures and adding notes. You want to have complete information so you can analyze this for improving your QA/QC process moving forward.you don't already use checklists, you can start by creating a checklist that includes similar checks to what your most experienced inspector(s) currently visually inspect.
Check out FTQ360's Tools for Deficiency Prevention:
Include a heading and checkpoints for each main area being inspected. Put these in the order your inspectors typically work. For example, you can organize your checklist first by exterior and interior areas and then add rooms and areas within those broader categories.
Include instructions for taking pictures and adding notes. You want to have complete information so you can analyze this for improving your QA/QC process moving forward.
Typically, there are 3 critical milestones you should inspect during the construction of a home. These are areas that are difficult to inspect at the final inspection and if defects come up later, they are expensive to fix. Remember to take pictures during these inspections to force inspectors to examine specific details.
After you have implemented these 3 critical milestone inspections, you know everything was inspected before it was covered up by other ongoing work.
Review the data from your final inspections and find out where most problems have been occurring. For example, what areas did not have problems throughout the project, and what areas had problems that had to be corrected? This information will give you an idea of when to include additional inspections at strategic points within the construction process.
The next step, after you establish your milestone inspections, is to improve the quality of the work being done so fewer deficiencies occur. This is accomplished by setting quality expectations and increasing subcontractor and crew accountability.
Improving quality performance benefits the bottom-line of both the homebuilder and subcontractor partner companies. So, taking a positive approach and including your subcontractors and crews in the planning of this process get you better results.
Work with your superintendents, subcontractors and crews to identify some well-known recurring issues that you want to eliminate. Create checklists of about 10 initial key check points to heighten awareness of these recurring issues (hotspots). If you're a home builder, you should have a checklist for each subcontractor’s trade. Include pictures that show what you expect in quality performance.
Use these checklists to do your inspections and take note about the parts of the project that were right the first time (first time quality) and those that were not. Adding a scoring system helps quantify whether performance goals are being met.
Collect the data from your inspections and generate performance reports. Associate the inspection data to who or what company did the work. This information will tell you who does the best work and who does not.
Share the performance reports with subcontractors and crews. This will motivate them to catch any problems before you do. If you make your expectations clear from the beginning, there is no reason major problems should come up at the end.
Subcontractors and crews should be finding and fixing their own deficiencies before you inspect their work. If they're not, it's because you're not setting the right expectations.
After you implement milestone inspections and generate performance reports to encourage subcontractors to be responsible for their own work, you should focus on using inspection data to continue to measure and improve quality.
There are three things to consider here:
You don’t need to be the only one that makes an effort to eliminate problems. Involve your subcontractors and crews in the improvement process. Over time, this tactic should eliminate your biggest problems in each trade specialty. If you eliminate your top 10 problems, the number of deficiencies that come up will be reduced dramatically. This will result in a huge payback for both your business and the subcontractor.
As you establish the best homebuilder quality control process possible, consider investing in Construction Quality Management software to make each of these tasks easier along the way. FTQ360 has built-in, editable checklists to help you get started, allows you to share pictures and inspection data in real-time, and effortlessly generate performance reports.
To learn more, visit FTQ360.com