Free Resources
Cycle time makes or breaks the Builder. Take too long to build, and the Builder risks lower margins if not losing money on the...
Pre-construction meetings, informal lookaheads, and formal preparatory meetings are common practices for planning project details for...
Many builders use construction checklists to verify critical milestones in the construction site and construction projects as a...
The least that you accept is the best that you’ll get. When you think about it, that’s the difference between today’s quality-focused...
An inspection checklist is worthless if the inspector only goes through the motions. Here are some tips for making sure busy field...
In construction projects, although defects are common problems that need to be dealt with routinely, their nature and type can vary...
Having an underperforming subcontractor on the team can drag a project down, causing unnecessary delays, increasing costs, and...
We’ve helped a lot of companies start a quality program, so we know the many pitfalls that can be avoided. While it’s likely that...
Proactive quality management means being prepared for the unexpected, with a plan in place to...
The construction industry is a potentially dangerous place to work but with the right safety management processes in place it doesn’t...
© 2019 FTQ360 Inc