Free Resources
Pre-construction meetings, informal lookaheads, and formal preparatory meetings are common practices for planning project details...
A lot of change is going on in the oil and gas industry. As a result, QA/QC (Quality Assurance and Quality Control) Inspectors in...
It's critical to assess the first-time quality performance of oil and gas vendors to encourage them to deliver 100% defect-free...
The final QA and production inspection is the last step in the construction process, and it's crucial for leaving a lasting...
An inspection checklist is worthless if the inspector only goes through the motions. Here are some tips for making sure busy...
We believe that defects are preventable and that achieving First Time Quality construction is possible for everyone.
In construction projects, although defects are common problems that need to be dealt with routinely, their nature and type can...
Having an underperforming subcontractor on the team can drag a project down, causing unnecessary delays, increasing costs, and...
We’ve helped a lot of companies start a quality program, so we know the many pitfalls that can be avoided. While it’s likely that...
Proactive quality management means being prepared for the unexpected, with a plan in place...
© 2019 FTQ360 Inc